The RMP generates a new Treatment Risk Comparison file once a batch of Treatment Area runs are complete.
From your project, click on the Overview tab.
Under Project outputs, click Results.
The Order number shows you which are the most recent results.
Click the Download icon to download the csv/xlsx spreadsheet.
The spreadsheet is a quantitative analysis of the treatments. The first tab shows the comparison summary. It compares the treatment run— including their economic and residential risks— against the baseline run and identifies which treatments resulted in better risk reduction. It includes a column for total asset damage cost (Economic Risk Reduction) that calculates the risk reduction in dollars.
Click on the different tabs to see a breakdown of each Treatment Area.